Blue Mountains Climber's Rescue Group

Six photos of the Practice Day 18/8/00 - from Richard Delaney
27 people attended and a couple of scenarios/systems were practised


The Larkin Frame in use to bring a loaded litter and attendant over the cliff edge


The Larkin Frame in use to bring a loaded litter and attendant over the cliff edge. Note the black independent belay rope in use.


Patient Bruce Cameron with Ken Luck as litter attendant. Note the ULR and Ken's use of ascenders to facilitate mobility.

     

above left - note the edge rollers for the belay line.
above right - note the equalised, bombproof central anchor point to facilitate minimum "loss of lift" during resets of the hauling system.


Detail of the equalised, bombproof central anchor point, the slings have been used to stagger the positions of the operators of the various units in the system- rescue line lower / belay line operator / reversible brake / bolt on hauling system. Refer to general set up page for more detail.

home | background | general set up | litter attachment | pulleys MA | standard methods | equipment
equip for call out | belay device | prac day reports | SAR reports | links | tips-tricks-trouble | FAQs